A Top-Five Pharmaceutical Manufacturer Achieves $7M+ in Annual Savings with Highwire
Background Cover Image

A top-five pharmaceutical company, experiencing rapid growth, initially relied on ISNetworld for basic contractor compliance. As their needs evolved, they required more detailed risk assessments and a streamlined, cost-effective process for managing all contractors on-site. Frustrated by ISN’s high costs, difficult enrollment, and limited insights, the company transitioned to Highwire to enhance efficiency, improve outcomes, and support contractor performance improvement.

The pharmaceutical manufacturer faced three major challenges:

  • Arduous Enrollment

    The manufacturer struggled to enroll more than 60% of contractors in ISN due to its complex registration process. Many, especially smaller contractors, resisted because of irrelevant questions, preventing full risk mitigation.

  • High Costs to Contractors

    ISN charged thousands for assessments, even for small contractors, creating enrollment friction. These costs were passed to the manufacturer, totaling millions yearly, while contractor complaints and waiver requests added internal strain.

  • Inconsistency in Assessments

    The pharmaceutical company required GCs and CMs to enforce safety standards during subcontractor reviews, but ISN didn’t provide them access. Non-ISN GCs used their own assessment methods, often misaligned with the owner’s standards

“We’ve observed that our safest jobs are also those with the highest quality. These are the jobs that come in closest to the cost and on schedule. There is huge business value in Highwire for us.“

— Director of Capital ProjectsPharmaceutical Manufacturer

“The industry has no idea how much better Highwire is than ISN.“

— Global Safety Director

Results

  • 100% compliance

    The assessment process is streamlined to accommodate contractors of any size. This ensures efficiency and ease for all parties involved, regardless of scale.

  • Meaningful collaboration

    The manufacturer, contractors, and construction managers are working together to enforce contractor management standards and deliver safe projects.

  • Millions Saved

    Highwire has helped the manufacturer save money by eliminating contractor enrollment costs passed on to the owner and reducing incident-related expenses.

Lowered TRIR by
35%
Incident-related savings of
$2.3M
Avoided contractor fees totaling
$5.5M